Our services
Support at each project stage.
AI helps us link drawings, correspondence and site records. At every stage, our experts check what those records show against what the contract requires.
Project brief
What are we committing to?
- Contract Review
- Identify the proposed responsibilities, scope gaps and assumptions that need a decision before design begins.
- Project Control
- Set out the first milestones and decisions in an outline programme.
Additional specialist support
Outline planning and early cost estimates.
Design
What changed between revisions?
- Document Intelligence
- Compare drawing revisions and trace each change to the register, transmittal and relevant correspondence.
- Contract Review
- Check design responsibilities and identify the decisions needed before the next issue.
Additional specialist support
Quantity take-offs and 4D sequence studies.
Tender & award
What needs clarifying before we sign?
- Contract Review
- Read the amendments alongside the tender qualifications to identify obligations, exclusions and notice periods.
- Document Intelligence
- Cross-check the scope, drawings and pricing documents for gaps or competing requirements.
Example · A gap in the tender price
Illustrative example. The specification calls for acoustic insulation, but the tender return excludes it. We trace the exclusion to the pricing schedule and raise one clarification before award. The tenderer can then confirm the scope and price in writing.
Additional specialist support
Estimating, tender programmes and logistics proposals.
Mobilisation
What must be in place before work starts?
- Site Diary
- Set up work areas, activities and daily records so the site team can capture progress from day one.
- Project Control
- Connect the starting programme to diary activities and assign owners to outstanding pre-start actions.
Additional specialist support
Site logistics, access planning and 4D sequencing.
Construction
What caused the change, and what did it affect?
- Site Diary and Document Intelligence
- Match dated work, labour and constraints to the drawing revision or instruction in force at the time.
- Contract Review and Project Control
- Check the notice provisions and test the recorded effects against the programme and cost records.
Example · A wall moves after setting out
Illustrative example. A revised drawing moves a partition. The dated site diary shows the team had marked out the original line. We check the instruction against the contract and the labour return for time spent setting out again. The variation records that work and flags any cost still to be evidenced.
Additional specialist support
Re-measurement and 5D cost visualisation.
Handover
What still needs evidence before close-out?
- Contract Review
- Identify the records, notices and outstanding obligations required for completion and the final account.
- Document Intelligence and Project Control
- Reconcile instructions, diary records and progress reports against outstanding changes.
Additional specialist support
Final quantity checks and reconciliation against the cost model.
Interactive demonstration
Inside the Site Diary
Follow a day on site. See how a record of the work, resources and constraints feeds into the comparison of planned and reported progress.
Open the Site Diary demo ↗